Filter Results

1501 to 1525 of 1549
swacnotes10715,final
mix pavers are unclear about when they need to get a solid waste handling permit when they are using RAS and RAP. o There ...
0.00199577771 |
a/111864
swacnotes10715,final
mix pavers are unclear about when they need to get a solid waste handling permit when they are using RAS and RAP. o There ...
0.00199577771 |
a/115575
subcommittee 3 investing for the future
examples include Magnuson Community Center, Magnuson Building 406, and South Park Community Center (in permitting)). ...
0.00199577771 |
a/126392
nov252013updatestobaselineproj
to increase participation 10%112,275 114,597 116,968 119,388 121,859 124,380 DWWNPDES surface water Permit -- requires ...
0.00199577771 |
a/111615
lpb2-17-21
, and deemed to be a safety threat and unable to be reused. The SDCI Director conferred with the DON Director, and the Landmarks Board and ...
0.00199577771 |
a/74648
july13docketpresentation
center.” This would be a permitted use under the current zoning and would therefore not need a Comprehensive Plan ...
0.00199577771 |
a/108793
march222012approvedminutes
on temporary uses is not on the worksheet. Commissioner Persons wondered about the demolition of housing. Ms. Sheehy ...
0.00199577771 |
a/108912
cap final executive summary
, potentially including NBA and NHL events, to Seattle and the region. • Provide for design, permitting, development, ...
0.00199577771 |
a/56226
seattle questions aeg response finance and legal final1
include permitting and other fees that aren’t included in Exhibit 1. 6. The proposal states that one of the sources for ...
0.00199577771 |
a/56280
general_govt_06-11
this project are: tenant improvements at Seattle Municipal Tower; tenant improvements at Airport Way Center (formerly Park 90/5); ...
0.00199577771 |
a/60951
magnuson park study rfp packet
uses are listed as permitted in the Overlay District, an NPS deed covenant only allows “Parks & Recreation uses” within ...
0.00199577771 |
a/142564
introduction
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.00199577771 |
a/62184
introduction
Pollutant Discharge Elimination System (NPDES) permits, one for stormwater and one for combined sewer system. The City is ...
0.00199577771 |
a/61921
3039304-sd decision
No. 3039304-SD Previous SEPA Related Actions Prior to application for a Public School Departure Permit, the District ...
0.00199577771 |
a/142816
introduction
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.00199577771 |
a/61909
seattledesigncommission-2005.06.16interurbanexchangeivampvalleyva ...
the funding is for the public benefits package and does it include everything proposed o The public benefits are tied to the master use ...
0.00199577771 |
a/85362
cost-of-green-survey-july2011
device or attached garageÌ1-7Ì5 Star: Install CO detector for all units (hardwired required) with a combustion deviceÌ1-8ÌProhibit burying ...
0.00199577771 |
a/88277
introduction
. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one ...
0.00199577771 |
a/61989
4185_preliminary_report_9082014
on the property would be compatible with Chef ‘n’s use. Daniel Bretzke September 8 2014, Page 3 of 11 Any development of the ...
0.00199577771 |
a/59338
spu_water_projects
to be built on schedule. The project is part of SDOT's Bridging the Gap program and needs to be completed prior to ...
0.00199577771 |
a/61731
seattledesigncommission-2004.03.04woodlandparkzoodiscoveryvillage ...
to add an educational component to the building that explains the history of the primate building on the site, and how the ...
0.00199577771 |
a/85334
fascap
, failing bulkhead at the Harbor Patrol Building. Design is funded in 2014 and permitting and construction will be ...
0.00199577771 |
a/62158
4186-preliminaryreport11102017
to be heard by the Seattle Design Commission during the Master Use Permit (MUP) process to ensure that the proposed 8th Ave ...
0.00199577771 |
a/59345
4185-revised-preliminary-report
some of the condominium units. Expansion of Chef’n on the property would be compatible with Chef ‘n’s use. Any development of the property ...
0.00199577771 |
a/59333
seattledesigncommission-2017.01.05portagebayparkminutes
team continues to develop refinements for park programming. SPR and the design team will hold four public meetings throughout the design ...
0.00199577771 |
a/85081